Initial Simulation Model for NEAT 4 hour rule Project
Simulation model of the WIP Conceptual map IM-7671 of initial scope of the effects of the ED 4 hour rule based on June WA Teleconference and IM-8221. See also the conceptual maps of addition of indirect effects at IM-7775 and the potential wider context map in IM-6167

Loading Insight Maker...
(This may take a few moments)