We`ve here a system model to describe a production line of computers and an operator. The operator has to connect a cable in each computer. He takes 5 minutes to do that. In this case he is busy. So all production line stops in this situation. After the operator return back to the available state the computers can be moved again in his direction. The connection here starts when a computers reach the x position equal to 34.