Clusters of interacting methods for improving health services network design and delivery. Includes Forrester quotes on statistical vs SD methods and the Modeller's dilemma. Simplified version of  IM-14982  combined with  IM-17598  and  IM-9773
Clusters of interacting methods for improving health services network design and delivery. Includes Forrester quotes on statistical vs SD methods and the Modeller's dilemma. Simplified version of IM-14982 combined with IM-17598 and IM-9773
   INDUSTRIAL AGRICULTURE IMPACT ON POLLUTION AND RESOURCES     THE 2017 MODEL (BY GUY LAKEMAN) EMPHASIZES THE PEAK IN POLLUTION BEING CREATED BY OVERPOPULATION WITH THE CARRYING CAPACITY OF ARABLE LAND NOW BEING 1.5 TIMES OVER A SUSTAINABLE FUTURE (PASSED IN 1990) AND NOW INCREASING IN LOSS OF HUMA

INDUSTRIAL AGRICULTURE IMPACT ON POLLUTION AND RESOURCES THE 2017 MODEL (BY GUY LAKEMAN) EMPHASIZES THE PEAK IN POLLUTION BEING CREATED BY OVERPOPULATION WITH THE CARRYING CAPACITY OF ARABLE LAND NOW BEING 1.5 TIMES OVER A SUSTAINABLE FUTURE (PASSED IN 1990) AND NOW INCREASING IN LOSS OF HUMAN SUSTAINABILITY DUE TO SEA RISE AND EXTREME GLOBAL WATER RELOCATION IN WEATHER CHANGES IN FLOODS AND DROUGHTS AND EXTENDED TROPICAL AND HORSE LATTITUDE CYCLONE ACTIVITY AROUND HADLEY CELLS

The World3 model is a detailed simulation of human population growth from 1900 into the future. It includes many environmental and demographic factors.

THIS MODEL BY GUY LAKEMAN, FROM METRICS OBTAINED USING A MORE COMPREHENSIVE VENSIM SOFTWARE MODEL, SHOWS CURRENT CONDITIONS CREATED BY THE LATEST WEATHER EXTREMES AND LOSS OF ARABLE LAND BY THE  ALBEDO EFECT MELTING THE POLAR CAPS TOGETHER WITH NORTHERN JETSTREAM SHIFT NORTHWARDS, AND A NECESSITY TO ACT BEFORE THERE IS HUGE SUFFERING.
BY SETTING THE NEW ECOLOGICAL POLICIES TO 2015 WE CAN SEE THAT SOME POPULATIONS CAN BE SAVED BUT CITIES WILL SUFFER MOST. 
CURRENT MARKET SATURATION PLATEAU OF SOLID PRODUCTS AND BEHAVIORAL SINK FACTORS ARE ALSO ADDED

Use the sliders to experiment with the initial amount of non-renewable resources to see how these affect the simulation. Does increasing the amount of non-renewable resources (which could occur through the development of better exploration technologies) improve our future? Also, experiment with the start date of a low birth-rate, environmentally focused policy.

 Simple Bass diffusion modified from Sterman Business Dynamics Ch9. Compare with the SI infectious disease model Insight 584.

Simple Bass diffusion modified from Sterman Business Dynamics Ch9. Compare with the SI infectious disease model Insight 584.

 Simple Bass diffusion modified from Sterman Business Dynamics Ch9. Compare with the SI infectious disease model Insight  584 .

Simple Bass diffusion modified from Sterman Business Dynamics Ch9. Compare with the SI infectious disease model Insight 584.

 There is a general belief that wind and solar will
enable us to get fossil-fuels-use to net-zero. This is, unfortunately,
impossible as an examination of only some limitations and constraints associated
with solar and wind energy will show. Solar panels and wind turbines have now been used for many

There is a general belief that wind and solar will enable us to get fossil-fuels-use to net-zero. This is, unfortunately, impossible as an examination of only some limitations and constraints associated with solar and wind energy will show. Solar panels and wind turbines have now been used for many years, but until now they represent only a tiny fraction of total energy use (not just electricity but all forms of energy).  In 2020, wind accounted for 3% of the world’s total energy consumption and solar amounted to 1% of total energy. Thus, the combination of wind and solar produced only 4% of world energy in 2020. How long will we have to wait before they can generate enough energy to power the world? The climate emergency will not wait.  Solar panels and wind turbines have average lifespans of around 15 to 30 years, then they need to be replaced. However, the manufacture of the replacements will require fossil fuels since one cannot use wind or solar to build wind and solar. Further, solar panels do not supply enough energy. The net-energy gained from solar panels is only about 3.9:1. This net-energy ratio is known as ‘energy return on energy invested’ (EROI) and is critically important.  Unfortunately, the EROI of solar is far too low to power a modern industrial society, which requires an EROI of about 12:1. There is also the question of space. Renewable energy sources can take up 1000 times more space than fossil fuel – that is bad news for agriculture and food production in a world that is already experiencing food shortages because of global warming. If you take these limitations into consideration, then it becomes clear that solar and wind cannot solve our energy problem – they are a fix that will inevitably fail

From William E. Novak and  Linda Levine CMU SEI Sept 2010 Success in Acquisition: Using Archetypes to Beat the Odds  paper  and  webpage
From William E. Novak and  Linda Levine CMU SEI Sept 2010 Success in Acquisition: Using Archetypes to Beat the Odds paper and webpage
 Purpose 1 New Small Business - Cloud Support Model  Purpose-To enable a visual model to acquire new business owners to adopt cloud services.      Purpose 2 Cloud Service Provider Delivery Model-Service   2. ​The purpose of this model intends to allow a cloud service provider a way to design offers
Purpose 1 New Small Business - Cloud Support Model
Purpose-To enable a visual model to acquire new business owners to adopt cloud services.   

Purpose 2 Cloud Service Provider Delivery Model-Service 

2. ​The purpose of this model intends to allow a cloud service provider a way to design offers for generic use across any industry.  

Outcome - Key Control for Segregation of Duties GAAP/GARP
3. The purpose of this model incorporates the variables of different components for completeness and monitoring scope for any master data update or create activity.  

Outcome - Key Controls for SOX 404 Assurances
Monitoring all activities for segregation of duties controls - in a control chart.  The model ensures a completeness criteria for cost structuring of any new offer or acquisition integration.  

GAAP-Non-GAAP Revenue
The primary inputs shown on this diagram trigger the leverage points for many of the dependent processes and management of an offers revenue treatment.  

Completeness - Supplies the various parts of the whole 
Organization or Agency models - simulations 
Stock and Flow models enable simulation of the proposed design with a better view into results of any proposed changes.   

Enterprise Architecture Value 

Predict changes and prepare for complexity based on the risk using the components simulated in stock and flow diagrams.  

Model and simulate the "as is" and "to be" or monitor as the way to ensure your architecture stability and when investments need to be made in a next generation strategy.  

Business Architecture Value
Use the whole and parts (stock and flow child) to better understand the "current state" measuring the transition to the desired state on the journey to a performance model.   

The model applies the rows from Enterprise Architecture as prescribed by Zachman Ontology v3.  Based on the way business requirements need to be applied to technology solutions.  


Row 1 - Executive - Context of the organization

Row 2 - Business Managers - Business Process connectivity

Row 3 - Architects - Systems - The transition from Business to Enterprise Architects.

Ideally-the offer management capability serves as one of 5 capabilities which must be in place to meet both financial and quality certification criteria for the majority of companies.  

Highway Analogy
A 5 capability model enables the audit relationships between different master record management audit log tracking for SOX to be used by quality management to align with corporate policies which intend to guide decision making within any size and any type organization or agency.  

Applied 
The system model would be copied by an organizations resource and inputs applied to a stock and flow diagram as prescribed in associated models.  Herein we must assume the whole and each of the stock and flow simulation models the component parts.  







 A simplified dynamic model, adapted from Engineering perspectives on healthcare delivery: Can we afford technological innovation in healthcare? Rouse, William B Systems Research and Behavioral Science 2009 Vol 26 (5) p573-582  abstract   Developed by Mark Heffernan. Addition of learning curve effec

A simplified dynamic model, adapted from Engineering perspectives on healthcare delivery: Can we afford technological innovation in healthcare? Rouse, William B Systems Research and Behavioral Science 2009 Vol 26 (5) p573-582 abstract  Developed by Mark Heffernan. Addition of learning curve effects IM-614 to Insight 435

 Simple Bass diffusion modified from Sterman Business Dynamics Ch9. Compare with the SI infectious disease model Insight  584 .

Simple Bass diffusion modified from Sterman Business Dynamics Ch9. Compare with the SI infectious disease model Insight 584.

 Simple Bass diffusion modified from Sterman Business Dynamics Ch9. Compare with the SI infectious disease model Insight  584 .

Simple Bass diffusion modified from Sterman Business Dynamics Ch9. Compare with the SI infectious disease model Insight 584.

​The Problem:  What is the true cost of escalation?    Things to measure: How does this impact:1. (MONEY) Cost per incident - what does this cost the business? 2. (TIME) Service Level - how does this impact desired service levels/SLAs? 3. (PEOPLE) Agent utilization - how does this impact backlog? ar
​The Problem: 
What is the true cost of escalation?

Things to measure: How does this impact:1. (MONEY) Cost per incident - what does this cost the business? 2. (TIME) Service Level - how does this impact desired service levels/SLAs? 3. (PEOPLE) Agent utilization - how does this impact backlog? are we overworking engineers? Does this contribute to staff burnout?

  Purpose 1 New Small Business - Cloud Support Model  Purpose-To enable a visual model to acquire new business owners to adopt cloud services.      Purpose 2 Cloud Service Provider Delivery Model-Service   2. ​The purpose of this model intends to allow a cloud service provider a way to design offers

Purpose 1 New Small Business - Cloud Support Model
Purpose-To enable a visual model to acquire new business owners to adopt cloud services.   

Purpose 2 Cloud Service Provider Delivery Model-Service 

2. ​The purpose of this model intends to allow a cloud service provider a way to design offers for generic use across any industry.  

Outcome - Key Control for Segregation of Duties GAAP/GARP
3. The purpose of this model incorporates the variables of different components for completeness and monitoring scope for any master data update or create activity.  

Outcome - Key Controls for SOX 404 Assurances
Monitoring all activities for segregation of duties controls - in a control chart.  The model ensures a completeness criteria for cost structuring of any new offer or acquisition integration.  

GAAP-Non-GAAP Revenue
The primary inputs shown on this diagram trigger the leverage points for many of the dependent processes and management of an offers revenue treatment.  

Completeness - Supplies the various parts of the whole 
Organization or Agency models - simulations 
Stock and Flow models enable simulation of the proposed design with a better view into results of any proposed changes.   

Enterprise Architecture Value 

Predict changes and prepare for complexity based on the risk using the components simulated in stock and flow diagrams.  

Model and simulate the "as is" and "to be" or monitor as the way to ensure your architecture stability and when investments need to be made in a next generation strategy.  

Business Architecture Value
Use the whole and parts (stock and flow child) to better understand the "current state" measuring the transition to the desired state on the journey to a performance model.   

The model applies the rows from Enterprise Architecture as prescribed by Zachman Ontology v3.  Based on the way business requirements need to be applied to technology solutions.  


Row 1 - Executive - Context of the organization

Row 2 - Business Managers - Business Process connectivity

Row 3 - Architects - Systems - The transition from Business to Enterprise Architects.

Ideally-the offer management capability serves as one of 5 capabilities which must be in place to meet both financial and quality certification criteria for the majority of companies.  

Highway Analogy
A 5 capability model enables the audit relationships between different master record management audit log tracking for SOX to be used by quality management to align with corporate policies which intend to guide decision making within any size and any type organization or agency.  

Applied 
The system model would be copied by an organizations resource and inputs applied to a stock and flow diagram as prescribed in associated models.  Herein we must assume the whole and each of the stock and flow simulation models the component parts.  







 Simple Bass diffusion modified from Sterman Business Dynamics Ch9. Compare with the SI infectious disease model Insight  584 .

Simple Bass diffusion modified from Sterman Business Dynamics Ch9. Compare with the SI infectious disease model Insight 584.

​The Problem:  What is the true cost of escalation?    Things to measure: How does this impact:1. (MONEY) Cost per incident - what does this cost the business? 2. (TIME) Service Level - how does this impact desired service levels/SLAs? 3. (PEOPLE) Agent utilization - how does this impact backlog? ar
​The Problem: 
What is the true cost of escalation?

Things to measure: How does this impact:1. (MONEY) Cost per incident - what does this cost the business? 2. (TIME) Service Level - how does this impact desired service levels/SLAs? 3. (PEOPLE) Agent utilization - how does this impact backlog? are we overworking engineers? Does this contribute to staff burnout?

 ​Purpose  Enables the different components in the 5 capability model in a visual manner for Enterprise and Business Architecture stakeholders.     5 Capability Model  The 5 capability model has many stock and flow children which each organization will need to model based on their current state.  
​Purpose
Enables the different components in the 5 capability model in a visual manner for Enterprise and Business Architecture stakeholders.  

5 Capability Model
The 5 capability model has many stock and flow children which each organization will need to model based on their current state.  

Semantic

Getting terms to align to the generic objects can be a trying task, unless you simply list the stakeholders "semantic" term below the stakeholder in the presentation layer by order shown in the business process management section above the capability management group.  



   THE 2018 MODEL (BY GUY LAKEMAN) EMPHASIZES THE PEAK IN POLLUTION BEING CREATED BY OVERPOPULATION.  WITH THE CARRYING CAPACITY OF ARABLE LAND NOW BEING 1.5 TIMES OVER A SUSTAINABLE FUTURE (PASSED IN 1990) AND NOW INCREASING IN LOSS OF HUMAN SUSTAINABILITY DUE TO SEA RISE AND EXTREME GLOBAL WATER R

THE 2018 MODEL (BY GUY LAKEMAN) EMPHASIZES THE PEAK IN POLLUTION BEING CREATED BY OVERPOPULATION.
WITH THE CARRYING CAPACITY OF ARABLE LAND NOW BEING 1.5 TIMES OVER A SUSTAINABLE FUTURE (PASSED IN 1990) AND NOW INCREASING IN LOSS OF HUMAN SUSTAINABILITY DUE TO SEA RISE AND EXTREME GLOBAL WATER RELOCATION IN WEATHER CHANGES IN FLOODS AND DROUGHTS AND EXTENDED TROPICAL AND HORSE LATTITUDE CYCLONE ACTIVITY AROUND HADLEY CELLS

The World3 model is a detailed simulation of human population growth from 1900 into the future. It includes many environmental and demographic factors.

THIS MODEL BY GUY LAKEMAN, FROM METRICS OBTAINED USING A MORE COMPREHENSIVE VENSIM SOFTWARE MODEL, SHOWS CURRENT CONDITIONS CREATED BY THE LATEST WEATHER EXTREMES AND LOSS OF ARABLE LAND BY THE  ALBEDO EFECT MELTING THE POLAR CAPS TOGETHER WITH NORTHERN JETSTREAM SHIFT NORTHWARDS, AND A NECESSITY TO ACT BEFORE THERE IS HUGE SUFFERING.
BY SETTING THE NEW ECOLOGICAL POLICIES TO 2015 WE CAN SEE THAT SOME POPULATIONS CAN BE SAVED BUT CITIES WILL SUFFER MOST. 
CURRENT MARKET SATURATION PLATEAU OF SOLID PRODUCTS AND BEHAVIORAL SINK FACTORS ARE ALSO ADDED

Use the sliders to experiment with the initial amount of non-renewable resources to see how these affect the simulation. Does increasing the amount of non-renewable resources (which could occur through the development of better exploration technologies) improve our future? Also, experiment with the start date of a low birth-rate, environmentally focused policy.

  ​Purpose  Enables the different components in the 5 capability model in a visual manner for Enterprise and Business Architecture stakeholders.     5 Capability Model  The 5 capability model has many stock and flow children which each organization will need to model based on their current state.  

​Purpose
Enables the different components in the 5 capability model in a visual manner for Enterprise and Business Architecture stakeholders.  

5 Capability Model
The 5 capability model has many stock and flow children which each organization will need to model based on their current state.  

Semantic

Getting terms to align to the generic objects can be a trying task, unless you simply list the stakeholders "semantic" term below the stakeholder in the presentation layer by order shown in the business process management section above the capability management group.  



 Simple Bass diffusion modified from Sterman Business Dynamics Ch9, with additional discarding

Simple Bass diffusion modified from Sterman Business Dynamics Ch9, with additional discarding

 The World3 model is a detailed simulation of human population growth from 1900 into the future. It includes many environmental and demographic factors. THIS MODEL BY GUY LAKEMAN, FROM METRICS OBTAINED USING A MORE COMPREHENSIVE VENSIM SOFTWARE MODEL, SHOWS CURRENT CONDITIONS CREATED BY THE LATEST W

The World3 model is a detailed simulation of human population growth from 1900 into the future. It includes many environmental and demographic factors.

THIS MODEL BY GUY LAKEMAN, FROM METRICS OBTAINED USING A MORE COMPREHENSIVE VENSIM SOFTWARE MODEL, SHOWS CURRENT CONDITIONS CREATED BY THE LATEST WEATHER EXTREMES AND LOSS OF ARABLE LAND BY THE  ALBEDO EFECT MELTING THE POLAR CAPS TOGETHER WITH NORTHERN JETSTREAM SHIFT NORTHWARDS, AND A NECESSITY TO ACT BEFORE THERE IS HUGE SUFFERING.
BY SETTING THE NEW ECOLOGICAL POLICIES TO 2015 WE CAN SEE THAT SOME POPULATIONS CAN BE SAVED BUT CITIES WILL SUFFER MOST. 
CURRENT MARKET SATURATION PLATEAU OF SOLID PRODUCTS AND BEHAVIORAL SINK FACTORS ARE ALSO ADDED

Use the sliders to experiment with the initial amount of non-renewable resources to see how these affect the simulation. Does increasing the amount of non-renewable resources (which could occur through the development of better exploration technologies) improve our future? Also, experiment with the start date of a low birth-rate, environmentally focused policy.

 Simple Bass diffusion modified from Sterman Business Dynamics Ch9. Compare with the SI infectious disease model Insight 584.

Simple Bass diffusion modified from Sterman Business Dynamics Ch9. Compare with the SI infectious disease model Insight 584.

​The Problem:  What is the true cost of escalating too many Tier 1/Level 1 tickets to Level 2/3 engineers?    Things to measure: How does this impact:1. (MONEY) Cost per incident - what does this cost the business? 2. (TIME) Service Level - how does this impact desired service levels/SLAs? 3. (PEOPL
​The Problem: 
What is the true cost of escalating too many Tier 1/Level 1 tickets to Level 2/3 engineers?

Things to measure: How does this impact:1. (MONEY) Cost per incident - what does this cost the business? 2. (TIME) Service Level - how does this impact desired service levels/SLAs? 3. (PEOPLE) Agent utilization - how does this impact backlog? are we overworking engineers? Does this contribute to staff burnout?

 Everyone intends the best in project-driven marriages of PMOs and contractors, but good intentions can't overcome the hostility generated by loss of trust and squabbles in poorly developed relationships. From William E. Novak and  Linda Levine CMU SEI Sept 2010 Success in Acquisition: Using Archety

Everyone intends the best in project-driven marriages of PMOs and contractors, but good intentions can't overcome the hostility generated by loss of trust and squabbles in poorly developed relationships. From William E. Novak and  Linda Levine CMU SEI Sept 2010 Success in Acquisition: Using Archetypes to Beat the Odds paper and see webpage



  Purpose 1 New Small Business - Cloud Support Model  Purpose-To enable a visual model to acquire new business owners to adopt cloud services.      Purpose 2 Cloud Service Provider Delivery Model-Service   2. ​The purpose of this model intends to allow a cloud service provider a way to design offers

Purpose 1 New Small Business - Cloud Support Model
Purpose-To enable a visual model to acquire new business owners to adopt cloud services.   

Purpose 2 Cloud Service Provider Delivery Model-Service 

2. ​The purpose of this model intends to allow a cloud service provider a way to design offers for generic use across any industry.  

Outcome - Key Control for Segregation of Duties GAAP/GARP
3. The purpose of this model incorporates the variables of different components for completeness and monitoring scope for any master data update or create activity.  

Outcome - Key Controls for SOX 404 Assurances
Monitoring all activities for segregation of duties controls - in a control chart.  The model ensures a completeness criteria for cost structuring of any new offer or acquisition integration.  

GAAP-Non-GAAP Revenue
The primary inputs shown on this diagram trigger the leverage points for many of the dependent processes and management of an offers revenue treatment.  

Completeness - Supplies the various parts of the whole 
Organization or Agency models - simulations 
Stock and Flow models enable simulation of the proposed design with a better view into results of any proposed changes.   

Enterprise Architecture Value 

Predict changes and prepare for complexity based on the risk using the components simulated in stock and flow diagrams.  

Model and simulate the "as is" and "to be" or monitor as the way to ensure your architecture stability and when investments need to be made in a next generation strategy.  

Business Architecture Value
Use the whole and parts (stock and flow child) to better understand the "current state" measuring the transition to the desired state on the journey to a performance model.   

The model applies the rows from Enterprise Architecture as prescribed by Zachman Ontology v3.  Based on the way business requirements need to be applied to technology solutions.  


Row 1 - Executive - Context of the organization

Row 2 - Business Managers - Business Process connectivity

Row 3 - Architects - Systems - The transition from Business to Enterprise Architects.

Ideally-the offer management capability serves as one of 5 capabilities which must be in place to meet both financial and quality certification criteria for the majority of companies.  

Highway Analogy
A 5 capability model enables the audit relationships between different master record management audit log tracking for SOX to be used by quality management to align with corporate policies which intend to guide decision making within any size and any type organization or agency.  

Applied 
The system model would be copied by an organizations resource and inputs applied to a stock and flow diagram as prescribed in associated models.  Herein we must assume the whole and each of the stock and flow simulation models the component parts.  







​The Problem:  What is the true cost of escalation?    Things to measure: How does this impact:1. (MONEY) Cost per incident - what does this cost the business? 2. (TIME) Service Level - how does this impact desired service levels/SLAs? 3. (PEOPLE) Agent utilization - how does this impact backlog? ar
​The Problem: 
What is the true cost of escalation?

Things to measure: How does this impact:1. (MONEY) Cost per incident - what does this cost the business? 2. (TIME) Service Level - how does this impact desired service levels/SLAs? 3. (PEOPLE) Agent utilization - how does this impact backlog? are we overworking engineers? Does this contribute to staff burnout?